Well, unfortunately the original Home Inspector has now caused a domino quagmire. First he raised the issue of the foundation piers, and then he told them there was a 1/2" crack in the foundation (only one in 80 yrs, I consider that good condition for old age!). While we were at the table he recommended that they get XYZ Foundation out to inspect and that it needed to be filled with epoxy. They looked at me and asked if I could fill it with epoxy, and while I was at it, could I fill the small crack in the concrete garage wall. I said yes, I will fill with epoxy.
Well, evidently that was a big mistake that we did!! First, it covered up the crack so that someone cannot really see how small or big the crack was. My carpenter measured it and it is only 1/4" at the widest.
Then they got scared after they got back to Chicago, and hired the XYZ Foundation Company. I was informed of this inspection after we had made all the repairs that were discussed at the table during the original inspection. The foundation company couldn’t come out until today and the clock is ticking.
Now it appears that the Foundation Company did not perform an ‘inspection’. They only come out to give an estimate to fix things. They have told the Buyer that the epoxy was not applied correctly - it needed to be ‘shot’ into the foundation. They are sending an estimate to correct the situation to the Buyers Friday morning. And they told the Buyers that they should have a Structural Engineer come out and inspect the foundation.
Now the Buyers are in a panic and have hired a Structural Engineer to come out and do a full report, to the tune of $750 at their cost. The Structural Engineer is coming Thursday at 1pm and I expect we will start all over with another quagmire. I will be there so that I can show this guy the detailed plans from the ‘other’ licensed Structural Engineer and the thousands of dollars we spent on new foundation stuff.
Buyers have hinted to my agent (they are being very coy because they know that the agent is representing both parties) that they will be asking for a ‘credit’ based on the estimate provided by the Foundation Repair company. I know this foundation repair company and they are the most expensive place in town. I have dealt with them several times before - they seem to be a favorite for real estate agents (who want to cover their butt) to call out for ‘estimates’.
So, what I am suffering here is a ‘pass the buck’ phenomenon where each party is trying to pass the liability to the next party. Original inspector specifically mentioned XYZ foundation company to come do an inspection because he was not an ‘expert’ on foundations. He recommended XYZ foundation because they are the highest cost company and most well known (to cover his butt). XYZ Foundation Company has now recommended Mr Structural Engineer because ‘they are not an expert on structural integrity’. Pass the buck for liability.
We cannot get a straight answer on whether Mr. Structural Engineer (they will not give my agent his name or phone nbr, just told her to meet him there to open up the house) is coming just to look at the epoxy and/or the crack, or whether he is coming to do an entire structural inspection.
Meanwhile, the Buyers have indicated that they are going to ask the Original Inspector to come back and inspect all the items repaired. This is After they communicated they want an independent inspector to come look at the repairs, and they even named the company in an email. I asked my agent if there is any way that I can legitimately refuse to have the same inspector back in my house??
Geez, the fun never ends. This is getting very stressful.